听声词典
简体 繁體

due date

D 开头单词

基本解释

  • [会计] 到期日

同根派生

     

英汉例句

    双语例句

  • Please contact an instructor or teaching assistant prior to the due-date if an extension is required.
    如果需要延期,请在到期日之前与指导老师或助教联系。
  • The undesired result could be that we stick to a too long time-buffer or quote an unrealistic due-date.
    不能在计划时间内完成负荷。 不良效果是我们的缓冲期太长,或者给出的是不切实际的交货期。
    www.u-toc.com
  • Firstly, the theory of the single machine E/T scheduling problem is introduced. Base on this, the heuristic algorithm of calculating the due-date and arranging the jobs is designed.
    通过对单机E/T调度问题上已经得到的一些理论成果的研究和总结,设计了多模具并行多机E/T调度问题中公共交货期的估计方法和排序工件的启发式方法。
  • 权威例句

  • The first cop (Takeshi Kaneshiro) ponders the expiration dates on cans of pineapple, asking if love has a past-due date, too.
    NEWYORKER: Chungking Express
  • We answer a key question about whether a U.S. retail forex trader can trade on a non-RFED registered foreign platform after the Oct. 18 registration due date (90 days after Dodd-Frank Fin Reg enactment).
    FORBES: Forex Traders Have A Little More Time
  • Karimzad asserts that much of the year-to-date game sales decline at the retailer is due to a 20%-plus drop in the number of new games issued by video-game publishers.
    FORBES: GameStop: Goldman Ups To Buy; Boost EPS Ests; Shrs Rally

词组短语

    短语

  • due -date limit 交货期限定
  • Due e date 到期日;信用卡还款日
  • Due -Date Bargainer 交货期协商器
  • due end date 应付止期
  • date due due date 到期日

英英字典

    剑桥英英字典

  • the date on which a woman's baby is expected to be born

专业释义

    经济学

  • 到期日
  • 满期日
  • 到期还款日
  • 到期之日
  • 计算机科学技术

  • 交货期

    This paper studies single-machine fuzzy scheduling problem. We formulate three kinds of scheduling model on the basis of fuzzy processing time and fuzzy due date.
    本文研究了单机模糊调度问题,基于模糊加工时间和模糊交货期建立了三种调度问题的模型,采用遗传算法搜索最优排序。

  • 预定日期
  • 到期日
  • 机械工程

  • 交工期
  • 能源科学技术

  • 交货期

    The mould manufacture scheduling based on due date is a problem of how to schedule operation processing sequence to minimize tardiness.
    基于交货期的模具车间作业调度问题是解决不同类型工件的加工排序,使其误工最少。

    管理学

  • 预定的日期
  • 预定日期
  • 医药科学

  • 预产期
  • 上一篇
  • 下一篇
友情链接

站内若未声明原创,则可用作非盈利目的,但请保留出处。部分内容源自网络,若有冒犯,请来信告知

| 词典 · www.tingseng.com